User Tools

Site Tools


zeiss_lsm_7_live_repair

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
zeiss_lsm_7_live_repair [2016/03/29 16:40]
bioimaging
zeiss_lsm_7_live_repair [2016/04/09 04:07]
bioimaging
Line 19: Line 19:
   * **06/​08/​09** - The system was re-assembled,​ re-aligned and tested following the collapse of the dropped ceiling on Room P2-B-53   * **06/​08/​09** - The system was re-assembled,​ re-aligned and tested following the collapse of the dropped ceiling on Room P2-B-53
  
----+----
  
 {{book.png|}}[[zeiss_lsm_7_live|Click here to get info on the Zeiss LSM 7 Live]] {{book.png|}}[[zeiss_lsm_7_live|Click here to get info on the Zeiss LSM 7 Live]]
zeiss_lsm_7_live_repair.txt ยท Last modified: 2016/04/09 04:07 by bioimaging