User Tools

Site Tools


3i_marianas_sdc

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
3i_marianas_sdc [2020/01/21 18:24]
bioimaging [Microscope Turn Off Procedure]
3i_marianas_sdc [2020/01/21 18:25]
bioimaging [Microscope Turn On Procedure]
Line 80: Line 80:
   * Turn on the power switch distributor (green) and the component power switches (red) **one at a time**   * Turn on the power switch distributor (green) and the component power switches (red) **one at a time**
 {{marianas_power3.jpg?​|}} {{marianas_power3.jpg?​|}}
-  * Turn on the secondary power supply switch +  * Turn on the secondary power supply switch ​(white socket outlet underneath the touchscreen)
-{{marianas_power2.jpg?​|}}+
   * Turn on the Yokogawa spinning disk scanner (using the key)   * Turn on the Yokogawa spinning disk scanner (using the key)
 {{marianas_power4.jpg?​|}} {{marianas_power4.jpg?​|}}
3i_marianas_sdc.txt · Last modified: 2024/04/01 23:50 by bioimaging